BlueHorseShoe · public node intelligence

Before you open, see the evidence.

A concise prospective-peer view for operators considering a channel. Start with the node's public posture, then inspect historical signals and reachability through its existing channels.

LN+ referral

Inspect another public node

Paste a compressed node public key to request the same bounded view.

Public-network evidence is point-in-time and may be incomplete. BHS does not inspect private wallet or forwarding data.
Node under review
kratom_tower
02fa01fc4c44e7e1c3121acdd095fef6918bc6fd43929d97fc542d3a391b3333c4
Current snapshot

Current snapshot

Public-network evidence is available for a prospective channel decision.

Overall score
80
BlueHorseShoe public-indicator score
Public classification
Positive Public Indicators
Not a recommendation
Network
Public Lightning network
Publicly observed
Evidence age
6 hr ago
Fresh until 2026-10-01 23:30:14.477776+10

Node posture and public indicators

Compact context for deciding what to investigate next.

Connectivity score60
Freshness score100
Capacity score75
Fee profile score100

Advertised capacity

13,250,000
Public capacity visible in the prepared snapshot; it is not a private balance.

Visible channels

6
Channels visible in the public graph snapshot used by this product.

Score confidence

Medium
Confidence describes the evidence available to the prepared product.

Fee posture

Advertised fee observations associated with the assessed node's public channels.

Minimum fee1 ppm
Maximum fee1 ppm
Median fee1.0 ppm
Capacity-weighted average1.00 ppm

Historical signals

Prepared comparison signals where sufficient history exists.

History confidenceHigh
7-day score trendIMPROVING
7-day capacity trendINCREASING
7-day channel-count trendINCREASING
7-day fee-profile trendSTABLE

Fee-profile trend is shown using the prepared product's semantic label; it is not presented as a claim that actual node fees rose or fell.

Reachability through existing channels

How effectively does this node's current channel set demonstrate public route reachability?

Each row is a public channel observed in the prepared evidence. The four directions describe route construction through the assessed node and its connected peer. Select deeper analysis to see observed amount and coverage detail.

Channels assessed6
Observed limitations6
Evidence coverage100%
Graph snapshot2026-09-24
Existing peerCapacityDirect node
→ peer
Direct peer
→ node
Outbound
from node
Inbound
to node
Details
Shockwave Rider03e9c99f...83556bb8Channel 1063583985879678977 4,250,000
Mixed results
Mixed results
Mixed results
Mixed results
Deeper analysis
Megalith LSP038a9e56...b5e889bfChannel 1057590548065943552 2,000,000
Mixed results
Mixed results
Mixed results
Mixed results
Deeper analysis
lacrypta-caba030ef510...94b37ee0Channel 1057528975336603649 2,000,000
Mixed results
Mixed results
Mixed results
Mixed results
Deeper analysis
MostrAR0271b5ca...63fafed0Channel 1060599911572897793 2,000,000
Mixed results
Mixed results
Mixed results
Mixed results
Deeper analysis
nodito03d85f3f...47eda771Channel 1057525676780224513 2,000,000
Mixed results
Mixed results
Mixed results
Mixed results
Deeper analysis
Megalith LSP038a9e56...b5e889bfChannel 1057525676762398720 1,000,000
Mixed results
Mixed results
Mixed results
Mixed results
Deeper analysis

Point-in-time public Lightning graph route construction.

Glossary

Definitions for the reachability evidence shown above.

Direct Node → Peer
Can a public route cross this specific channel from the node to a peer?
Direct Peer → Node
Can a public route cross this specific channel from the peer back to the node?
Outbound From Node
Can this channel act as the first step in routes from the node onward to the tested destinations?
Inbound To Node
Can this channel act as the final step in routes from the tested destinations back to the node?
Route observations
Public route results observed during the prepared tests. Routes observed means a route was constructed; Mixed results means results were not consistent across the tested conditions; Insufficient evidence means the evidence was not enough to assess the direction.
Route-construction coverage
The proportion of tested route constructions that produced a result, for example 1/1 (100%).
Destination coverage
The proportion of tested destinations for which a route result was observed, for example 1/1 (100%).
Observed amount
The payment amount used in a public routing test or the highest amount observed to route. It is not private liquidity, a channel balance or guaranteed forwarding capacity.